Bathroom

Before Remodel Shot

1980’s Bath that was in need of some TLC

Drew Doing the Demo

Bath Demo down to Studs. Minor water damage was discovered after removing shower walls.

Tile Work

Shower tiling in work. Cement Backer Board was used to increase life of shower and prevent water damage. The red color is a product that creates a waterproof membrane so the shower will never leak.

Heated Floor Install

Heated floor and this warm plank tile provided a luxurious fell.

Completed Bathroom Remodel

Completed Bath. The floor to ceiling tile in the shower gave the bathroom a much larger appearance. Added lighting helped highlight the accent tile and shower nook.

Completed Bath Vanity

Finished remodel of sink, toilet and cabinet

Powder Room

Before Shot of Vanity and Toilet

80’s style powder room with low vanity.

Vanity Flooring

During Demo of this room it was discovered that the hard wood floors did not extend under the original vanity. This beatuiful tile mat not only solved the problem with minimal cost but also became the signature piece of the room.

After shot of vanity and toilet

Completed Powder room. The white Wains coating updated and gave this room a larger feel. Vanity and Toilet we’re also updated.

Gate 

Custom Gate

Gate Manufacturer and Install