top of page
Projects
Bathroom
![]() 1980’s Bath that was in need of some TLC | ![]() Bath Demo down to Studs. Minor water damage was discovered after removing shower walls. | ![]() Shower tiling in work. Cement Backer Board was used to increase life of shower and prevent water damage. The red color is a product that creates a waterproof membrane so the shower will never leak. |
---|---|---|
![]() Heated floor and this warm plank tile provided a luxurious fell. | ![]() Completed Bath. The floor to ceiling tile in the shower gave the bathroom a much larger appearance. Added lighting helped highlight the accent tile and shower nook. | ![]() Finished remodel of sink, toilet and cabinet |
Powder Room
![]() 80’s style powder room with low vanity. | ![]() During Demo of this room it was discovered that the hard wood floors did not extend under the original vanity. This beatuiful tile mat not only solved the problem with minimal cost but also became the signature piece of the room. | ![]() Completed Powder room. The white Wains coating updated and gave this room a larger feel. Vanity and Toilet we’re also updated. |
---|
Gate
![]() Gate Manufacturer and Install |
---|
bottom of page